Funkenschlag: Québec/Baden-Württemberg

€12.00
Tax included
The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.
Quantity
Last items in stock

The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.

In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will remain until purchased by a player or removed when the number on it is lower than the number of cities power by any player. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.

In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may be connected only starting in »step 2«.

Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.

Incorporates maps from:

Mégawatts
Funkenschlag: EnBW

4260300450011
2F-Spiele
SS-2F14003
1 Item

Data sheet

Minimum number of players
2
Maximum number of players
6
Age
14+
Playing time
2 hours
Language
German
Language dependent
No text
Designer
Friedemann Friese
How many players?
For 2
How many players?
Big groups (5-6)
How many players?
Small groups (2-4)
Game mechanism
Auction